Gradually working my way up the creek with a few mock ups and a pair of nearly finished cottages started back in 2016

in post #192.
The mock buildings that adjoin the cottages are not really representative of what the final buildings will be, these can be seen on the drawing in post #380 back in Oct.'23.....time fly's !
The building to the left of the pub is the gate keeper's cottage for the LNER wharf which sits inside the 18' boundary wall.

